New front windows; front door are installed. Terry (our contractor) has finished the upstairs bathroom (we have to paint it) and is almost finished the downstairs bathroom. The new counter top & taps are installed in the kitchen.
The major hold up now is that Marion & I told the painter we would paint all the trim before he showed up (save some $$$) but when we said that there was very little white trim - most of the trim was stained wood.
Since then, however, we decided to take out all the interior doors & replace them with 800 series white doors
- 9 passage doors
- 2 bi-fold doors
- 6 sliding closet doors
Now we have to paint all the doors & all the trim in the house before the painter & floor guys come.
Trim upstairs is almost done :)
1 comment:
Wow. I am unsurprised :) But still impressed.
Post a Comment